< Back to news

10/01/2020 - Manchester

New section of the Metrolink (tram) system to open soon

The new section of the Metrolink (tram) system which runs through Trafford Park to The Trafford Centre, with a stop at the end of Third Avenue, is due to open in April 2020. Test runs are being carried out at the moment.